Certificate of Acceptance

Print
Press Enter to show all options, press Tab go to next option
At the completion of the two (2) year maintenance bond and after the appropriate follow-up inspections have verified that all infrastructure continues to meet design standards and is being properly maintained, a Certificate of Acceptance will be issued. At this point any deficiencies noted during the follow-up inspections have been corrected to the satisfaction of the city. The maintenance bond will be allowed to expire, and the city will assume the responsibility for maintenance of the infrastructure.

Certificate of Acceptance

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer