ALL FINAL INSPECTIONS
Back to flowchart
All final inspections shall be
completed prior to issuance of a Certificate of Occupancy.
These include the following specific inspections:
|
Pre-Construction Meetings |
|
CONSTRUCTION INSPECTIONS
|
![]()
|
PLUMBING ROUGH INSPECTIONS
|
![]()
|
FOUNDATION (Engineer’s letter) |
![]()
|
STRUCTURAL Structural frame walls & piers (Engineer’s letter) |
![]()
|
||||||||||||||||||||
![]()
|
|||||||||||||||
|
PRE C/O INSPECTION |
|
FINAL INSPECTIONS
|
|
R.O.W. INFRASTRUCTURE FINAL Letter of notification As build/record drawings 2 year maintenance bonds |
|
BUILDING/ENERGY FINAL |
|
Certificate of Occupancy |