ALL FINAL INSPECTIONS
Back to flowchart

 

 

All final inspections shall be completed prior to issuance of a Certificate of Occupancy.
These include the following specific inspections:

 

Pre-Construction Meetings

 

CONSTRUCTION INSPECTIONS

PLUMBING ROUGH INSPECTIONS

Plumbing rough

2025

 

Building water

1022

Building sewer

1021

 

Interceptor

2022

   

 

Storm drainage

1055

 

FOUNDATION

(Engineer’s letter)

 

STRUCTURAL

Structural frame walls & piers

(Engineer’s letter)

 

PLUMBING TOP OUT            

 

ELECTRICAL ROUGH

Plumbing top out

3020

 

Rough ceiling

3011

Gas rough test

3021

 

Wall rough

3012

Fire sprinkler above ground

3041

 

 

 

 

HVAC ROUGH       

 

BUILDING FRAME

HVAC rough

3030

 

  Building frame

     3040

Vent a hood

3031

 

 

 

PRE C/O INSPECTION

Public Works water & sewer punch list 7500

FINAL INSPECTIONS

Plumbing final

4020

 

City Public Works backflow certification

4022

HVAC final

4030

 

Site drainage paving letter

9900

Electric final

4010

 

Fire final

4002

Retaining wall

1041

 

Zoning final

4037

Landscaping final

4035

 

 

 

R.O.W. INFRASTRUCTURE FINAL

Letter of notification

As build/record drawings

2 year maintenance bonds

5050

BUILDING/ENERGY FINAL

4040

Certificate of Occupancy