News & Updates

Print
Press Enter to show all options, press Tab go to next option
RSS

 

 

NTTA to Close Direct-Connector Ramps Nightly between I-35E and PGBT

Post Date:09/16/2019 4:35 PM

NTTA TRAFFIC ADVISORY

PGBT-Tollway-imagePRESIDENT GEORGE BUSH TURNPIKE  

The following closures are needed for maintenance activities on the President George Bush Turnpike (PGBT):

  • Tuesday, September 17, through the morning of Friday, September 20 (Nightly): 

    The east- and westbound PGBT to southbound Interstate 35E (I-35E) direct-connector ramps will be closed nightly from 10 p.m. to 5 a.m. Tuesday, September 17, through the morning of Friday, September 20.

  • Detour from eastbound PGBT to southbound I-35E: Motorists will exit at Sandy Lake Road and turn right. They will continue east on Sandy Lake Road to the I-35E frontage road and turn right to enter southbound I-35E.
  • Detour from westbound PGBT to southbound I-35E: Motorists will exit at Old Denton Road and turn left. They will continue south on Old Denton Road to Whitlock Lane and make a right. From there, they will continue to the I-35E frontage road and turn left to enter southbound I-35E.

See map for additional information.

Message boards will be placed nearby to alert motorists of the closure.

All closures are subject to weather conditions and will be postponed, if necessary.

For more information about upcoming lane closures and traffic-related news along NTTA roads, go to the “Scheduled Lane Closures” link at www.ntta.org.

PGBT-Sept-17-Closures-map


UPDATE - NTTA to Close Lanes and Ramps Nightly on PGBT and Trinity Mills between McCoy Road and Kelly Boulevard
Posted  9/4/2019 11:30 AM

NTTA TRAFFIC ADVISORY

PRESIDENT GEORGE BUSH TURNPIKE  

PGBT-Tollway-imageWednesday September 4 through the morning of Thursday, September 5 (Nightly)

The following lanes and ramps will be closed nightly from 10 p.m. to 5 a.m.:

  • Two westbound right lanes between Kelly Boulevard and McCoy Road
  • Westbound entrance ramp from Trinity Mills Road
  • Westbound exit ramp to Josey Lane
  • Two eastbound right lanes between McCoy Road and Kelly Boulevard
  • Eastbound entrance ramp from Josey Lane
  • Eastbound exit ramp to Kelly Boulevard

Thursday, September 5, through the morning of Saturday, September 7 (Nightly)

The following lanes will be closed nightly from 10 p.m. to 5 a.m.:

  • Two eastbound left lanes between McCoy Road and Kelly Boulevard

All closures are subject to weather conditions and will be postponed, if necessary. Motorists are urged to use caution in the construction area.

Construction work for this project includes adding a fourth lane in each direction from I-35E to the Dallas North Tollway.  The NTTA appreciates the public’s patience during the ongoing improvements work.

For more information about upcoming lane closures and traffic-related news along NTTA roads, go to the “Scheduled Lane Closures” link at www.ntta.org.


UPDATES — NTTA to Close Westbound Trinity Mills Between McCoy and Old Denton

Posted  8/15/2019 10:29 AM

NTTA TRAFFIC ALERT

The following closures are needed for construction activities associated with the President George Bush Turnpike (PGBT) Widening Projects:

NTTA_Westbound-PGBT-Trinity-Mills-MapFriday, August 16, through Monday, Aug. 19 (Continuous closure)

The following lanes will be closed 10 p.m. Friday, August 16, through 5 a.m. Monday, August 19:

  • Various westbound lanes between Trinity Mills Road and McCoy Road will be closed. A minimum of one lane will remain open to traffic.

  • The following ramps may be closed during this time:
    • Westbound entrance ramp from Trinity Mills Road
    • Westbound exit ramp to Josey Lane

Trinity Mills to westbound PGBT detour: Motorists will continue west on Trinity Mills Road to Josey Lane. Motorists will then continue west through the Josey Lane intersection and use the entrance ramp to enter westbound PGBT.

Westbound PGBT to Josey Lane detour: Motorists will continue west and take the Old Denton Road exit ramp. Motorists will then turn right onto northbound Old Denton Road and continue north to Frankford Road, where they will turn right. Motorists will then continue east on Frankford Road to Josey Lane.

Changeable message signs will be placed prior to lane closures in the construction area.

See map for additional information.

All closures are subject to weather conditions and will be postponed, if necessary. Motorists are urged to use caution in the construction area.

Construction work for this project includes adding a fourth lane in each direction from I-35E to the Dallas North Tollway.  The NTTA appreciates the public’s patience during the ongoing improvements work.

For more information about upcoming lane closures and traffic-related news along NTTA roads, go to the “Scheduled Lane Closures” link at www.ntta.org.


UPDATE - NTTA to Close Westbound Huffines Boulevard and Eastbound Marchant Boulevard Nightly at the SRT
Posted  8/11/2019 2:34 PM

NTTA TRAFFIC ADVISORY

Closing_HuffinesMarchant-SRTThe following closures are needed for construction activities associated with the Sam Rayburn Tollway (SRT) Fourth Lane Project:

Saturday, August 10, through the morning of August 31 (Nightly)      

All eastbound and westbound lanes of the SRT frontage road/State Highway 121 (SH 121) at Huffines Boulevard/Marchant Boulevard will be closed nightly from 9 p.m. to 5 a.m. Saturday, August 10, through the morning of August 31. 

  • Westbound Huffines Boulevard detour: Motorists will turn west onto Hebron Parkway and continue to Huffines Boulevard signal, where they will turn right. 
  • Eastbound Marchant Boulevard detour: Motorists will turn right onto SH 121 and enter the SRT. They will take the first exit to Hebron Parkway and turn left, then make another left onto westbound SRT. Motorists will exit the SRT at Huffines Boulevard/Marchant Boulevard and turn right. Note: This detour does not include tolls.

Construction work for this project includes adding a fourth lane in each direction from U.S. 75 to south of Denton Tap Road. 

Changeable message signs will be placed prior to lane closures in the construction area.

All closures are subject to weather conditions and will be postponed, if necessary. Motorists are urged to use caution in the construction area.

The NTTA appreciates the public’s patience during the ongoing improvements work.

For more information about upcoming lane closures and traffic-related news along NTTA roads, go to the “Scheduled Lane Closures” link at www.ntta.org.


NTTA to Close Several Roads Nightly for Construction Activities Near Major Highways
Posted  8/7/2019 12:35 PM

NTTA TRAFFIC ADVISORY

The following closures are needed for construction activities associated with the President George Bush Widening Project:

PGBT-Tollway-imageThursday, August 8, through the morning of Friday, August 9 (Overnight)

  • Two westbound left lanes between the Sandy Lake Road Main Lane Gantry and Valley View Lane will be closed overnight from 8 p.m. Thursday, August 8 to 5 a.m. Friday, August 9.
  • Two eastbound left lanes between Valley View Lane and Interstate 35E will be closed overnight from 9 p.m. Thursday, August 8 to 5 a.m. Friday, August 9.

Changeable message signs will be placed prior to lane closures in the construction area.

All closures are subject to weather conditions and will be postponed, if necessary. Motorists are urged to use caution in the construction area.

Construction work for this project includes adding a fourth lane in each direction between Interstate 35E and Belt Line Road in Irving. The NTTA appreciates the public’s patience during the ongoing improvements work.

For more information about upcoming lane closures and traffic-related news along NTTA roads, go to the “Scheduled Lane Closures” link at www.ntta.org.

_________________________________________

NTTA TRAFFIC ADVISORY

The following closures are needed for construction activities associated with the President George Bush Turnpike (PGBT) Widening Projects:

PGBT-Tollway-imageSunday, August 4, through the morning of Monday, August 5 (Overnight)

• Two westbound left lanes between Interstate 35E (I-35E) and the Sandy Lake Road Main Lane Gantry will be closed overnight from 7 p.m. Sunday, August 4 to 5 a.m. Monday, August 5.

• Two eastbound left lanes between Belt Line Road/Luna Road and I-35E will be closed overnight from 10 p.m. Sunday, August 4 to 5 a.m. Monday, August 5

Monday, August 5, through the morning of Tuesday, August 6 (Overnight)

• Two westbound left lanes between I-35E and the Sandy Lake Road Main Lane Gantry will be closed overnight from 8 p.m. Monday, August 45 to 5 a.m. Tuesday, August 6.

• Two eastbound left lanes between Belt Line Road/Luna Road and I-35E will be closed overnight from 8 p.m. Monday, August 5 to 5 a.m. Tuesday, August 6

Changeable message signs will be placed prior to lane closures in the construction area.

All closures are subject to weather conditions and will be postponed, if necessary. Motorists are urged to use caution in the construction area.

Construction work for this project includes adding a fourth lane in each direction between I-35E and Belt Line Road in Irving. The NTTA appreciates the public’s patience during the ongoing improvements work.

For more information about upcoming lane closures and traffic-related news along NTTA roads, go to the “Scheduled Lane Closures” link at www.ntta.org.

_________________________________________

NTTA TRAFFIC ADVISORY

The following closures are needed for construction activities associated with the Sam Rayburn Tollway (SRT) Fourth Lane Project:  SRT Fourth Lane Project:

SRT Toll imageThursday, August 1 through the morning of Augusts 24 (Nightly)

All lanes of Lake Vista Drive, including the U-turns, between north- and southbound State Highway (SH 121) (the SRT frontage road), will be closed nightly from 9:00 p.m. to 5:00 a.m. Thursday, August 1, through the morning of August 24.

Northbound Lake Vista Drive detour: Motorists will turn right onto SH 121 and travel over Interstate 35E, where they will make a left onto the I-35E frontage road and another left onto westbound SH 121. Motorists will then continue west to Lake Vista Drive where they will turn right.

Southbound Lake Vista Drive detour: Motorists will turn right onto SH 121 and make a U-turn at MacArthur Boulevard. Motorists will then continue east to Lake Vista Drive where they will turn right.

Construction work for this project includes adding a fourth lane in each direction from U.S. 75 to south of Denton Tap Road. 

Changeable message signs will be placed prior to lane closures in the construction area.

See attached map for additional information.

All closures are subject to weather conditions and will be postponed, if necessary. Motorists are urged to use caution in the construction area.

The NTTA appreciates the public’s patience during the ongoing improvements work.

For more information about upcoming lane closures and traffic-related news along NTTA roads, go to the “Scheduled Lane Closures” link at www.ntta.org.

_________________________________________

NTTA TRAFFIC ADVISORY

The following closures are needed for construction activities associated with the SRT Fourth Lane Project:

SRT Toll imageWednesday, July 31, through the morning of Aug. 21 (Nightly)

All lanes of Denton Tap Road, including the U-turns between north- and southbound (State Highway 121 (SH 121), the SRT frontage road, will be closed nightly from 9 p.m. to 5 a.m. Wednesday, July 31, through the morning of Aug. 21.

Northbound Denton Tap Road detour: Motorists will turn right onto SH 121 and make a U-turn at MacArthur Boulevard. Motorists will then continue west to Denton Tap Road, where they will turn right.

Southbound Denton Tap Road detour: Motorists will turn right onto westbound SH 121 and continue to Freeport Parkway. From here they can make the U-turn and travel back northeast to Denton Tap Road, where they will turn right.

Changeable message signs will be placed prior to lane closures in the construction area. NTTA coordinated these closures with the City of Coppell. 

See map for additional information.

All closures are subject to weather conditions and will be postponed, if necessary. Motorists are urged to use caution in the construction area.

Lake-Vista-Map

The NTTA appreciates the public’s patience during the ongoing improvements work.

For more information about upcoming lane closures and traffic-related news along NTTA roads, go to the “Scheduled Lane Closures” link at www.ntta.org.

This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If you are NOT the intended recipient and receive this communication, please delete this message and any attachments. Thank you.


NTTA to Temporarily Establish Two-Way Traffic on PGBT Bridge at Scott Mill Road

Posted  7/23/2019 4:05 PM

NTTA TRAFFIC ADVISORY

SRT Toll imageThe following closures are needed for maintenance activities:

Wednesday, July 24 through August 1 (Daily)

Three westbound right lanes of Hebron Parkway beneath the Sam Rayburn Tollway (SRT) will be closed daily from 9 a.m. to 3 p.m. beginning Wednesday, July 24 through August. 1.

Note: The left lane of westbound Hebron Parkway will remain open to traffic during this closure.

Changeable message signs will be placed prior to lane closures in the construction area.

All closures are subject to weather conditions and will be postponed, if necessary. Motorists are urged to use caution in the construction area.

For more information about upcoming lane closures and traffic-related news along NTTA roads, go to the “Scheduled Lane Closures” link at www.ntta.org.

 


 

NTTA to Temporarily Establish Two-Way Traffic on PGBT Bridge at Scott Mill Road
Posted  7/12/2019 8:26 AM

TRAFFIC ADVISORY: PGBT Bridge at Scott Mill Road

The North Texas Tollway Authority (NTTA) has advised the City of Carrollton of the following road construction and repair activities:

President George Bush Turnpike (PGBT) Bridges Repair Update

Rehabilitation repairs to the Scott Mill Road and Kelly Boulevard Bridges over President George Bush Turnpike (PGBT) are proceeding as scheduled.  As the project continues, there will be a phased traffic switch on Scott Mill Bridge on Monday, July 15. During this traffic switch, two way traffic will be temporarily reestablished on the west half of the Scott Mill Bridge in temporary travel lanes.

A temporary traffic signal will also be installed to help in directing traffic and will remain operational until the end of summer when the remaining work is complete and the existing traffic signal can return to service.

Sam Rayburn Tollway Bridge Repair at Southbound Hebron Parkway

The Sam Rayburn Tollway Bridge over southbound Hebron Parkway was damaged recently and needs to be repaired by NTTA for public safety. The repairs will require the closure of three right southbound lanes under the SRT bridge. These closures have been tentatively scheduled between the hours of 9 a.m. and 3 p.m. from Monday, July 22 through Monday, July 29 and will run daily as needed until the repairs are completed. 

General NTTA Construction and Repairs Notice

All closures, construction, and repairs are subject to weather conditions and will be postponed, if necessary. Motorists are urged to use caution in the construction area.

The NTTA appreciates the public’s patience during the ongoing improvements work.

For more information about upcoming lane closures and traffic-related news along NTTA roads, go to the “Scheduled Lane Closures” link at www.ntta.org.

 


 

TRAFFIC ADVISORY: NTTA to Close Westbound Hebron Parkway Under Sam Rayburn Tollway Nightly

Posted 7/10/2019    5:02 p.m.

NTTA to Close Westbound Hebron Parkway Nightly

NTTA-SRT_WB-HebronPkwy-imageThe following closures are needed for construction activities associated with the Sam Rayburn Tollway (SRT) Fourth Lane Project: 

Wednesday, July 10, through the morning of July 31 (Nightly)
All lanes of westbound Hebron Parkway beneath the SRT will be closed nightly from 10 p.m. to 5 a.m.

Westbound Hebron Parkway Detour
Motorists will turn right onto SH 121 (the SRT frontage road) and make a U-turn at Carrollton Parkway. Motorists will then continue southwest to Hebron Parkway where they will turn right.

Construction work for this project includes adding a fourth lane in each direction from U.S. 75 to south of Denton Tap Road. See map.

Changeable message signs will be placed prior to lane closures in the construction area.

SRT Toll imageAll closures are subject to weather conditions and will be postponed, if necessary. Motorists are urged to use caution in the construction area.

The NTTA appreciates the public’s patience during the ongoing improvements work.

For more information about upcoming lane closures and traffic-related news along NTTA roads, go to the “Scheduled Lane Closures” link at www.ntta.org.

 

 


 

TRAFFIC ADVISORY: NTTA Closed Westbound Trinity Mills Frontage Road and Two Westbound PGBT Lanes
Posted 6/17/2019    3:05 p.m.

NTTA TRAFFIC ADVISORY

Between Kelly Boulevard and Scott Mill Road, the North Texas Tollway Authority (NTTA) currently has the westbound Trinity Mills frontage road of President George Bush Turnpike (PGBT) completely closed and two of the west main lanes of PGBT closed due to an issue they have with one of their pieces of construction equipment leaning.

NTTA hopes to have the main lanes open by the afternoon/evening peak rush hour and the frontage road open sometime this evening. As this is an unanticipated issue NTTA does not know exactly when the roadways will be re-opened. In the meantime, AVOID THE AREA and seek alternative routes.

 


  

TRAFFIC ADVISORY: NTTA to Close Two Westbound Left Lanes at Belt Line and Luna Roads

Posted 6/14/2019    12:08 p.m.

 

NTTA TRAFFIC ADVISORY

NTTA - PGBT Toll Sign

The following closures are needed for maintenance work:

 

Saturday, June 15

Two westbound left lanes of the President George Bush Turnpike at Belt Line/Luna Roads will be closed  from 5 a.m. to 2 p.m.

One lane will remain open to traffic.

Message boards will be placed nearby to alert motorists of the closure.

All closures are subject to weather conditions and will be postponed, if necessary.

For more information about upcoming lane closures and traffic-related news along NTTA roadways, go to the “Scheduled Lane Closures” listing at www.ntta.org.

 


 

SRT Toll imageTRAFFIC ADVISORY: NTTA to Close Two Eastbound Lanes and Two Ramps on the SRT Nightly

Posted 5/28/2019    5:38 p.m.

The following closures are needed for construction activities associated with the SRT Fourth Lane Project.

Wednesday, May 29, through the morning of Friday, May 31 (Nightly)

  • Two eastbound right lanes between Plano Parkway/Paige Road and the Josey Lane Main Lane Toll Gantry will close nightly from 10 p.m. to 5 a.m.
  • The eastbound exit ramp to Josey Lane/Main Street will close nightly from 10 p.m. to 5 a.m.
  • The eastbound entrance ramp from Josey Lane/Main Street will close nightly from 10 p.m. to 5 a.m.

 

Changeable message signs will be placed prior to lane closures in the construction area.

All closures are subject to weather conditions and will be postponed, if necessary. Motorists are urged to use caution in the construction area.

The NTTA appreciates the public’s patience during the ongoing improvements work.

For more information about upcoming lane closures and traffic-related news along NTTA roads, go to the “Scheduled Lane Closures” link at www.ntta.org.

 

 

Posted 5/15/2019  10:31 a.m.

Beginning Saturday, June 1 and continuing until mid-August, both the Scott Mill Road and Kelly Boulevard bridges over President George Bush Turnpike (PGBT) in Carrollton will be partially closed. These 24-hour-a-day partial closures are needed so that NTTA construction crews may do some rehabilitation work at each end of the bridges.

On the Scott Mill Road bridge all southbound lanes will be closed. One northbound lane of Scott Mill Road bridge will remain open.

Northbound traffic on the Kelly Boulevard bridge over PGBT will change from four to two northbound lanes. Southbound drivers will use the other one lane in order to continue to their destination.

The traffic pattern at both locations will change in mid-July when traffic is switched to other lanes.

Additional information can be found here.

For questions, visit ntta.org, ProgressNTTA.org, or call 972-628-3134.

 

 

NTTA_Bridge-Construction-diagram


  


NTTA to Close Several Roads Nightly for Construction Activities Near Major Highways
Posted  8/7/2019 12:35 PM


NTTA to Close Several Roads Nightly for Construction Activities Near Major Highways
Posted  8/7/2019 12:35 PM


NTTA to Close Several Roads Nightly for Construction Activities Near Major Highways
Posted  8/7/2019 12:35 PM

NTTA TRAFFIC ADVISORY


NTTA to Close Several Roads Nightly for Construction Activities Near Major Highways
Posted  8/7/2019 12:35 PM

NTTA TRAFFIC ADVISORY


Return to full list >>