RFQ Results

Print
Press Enter to show all options, press Tab go to next option

 

DRAINAGE PROJECTS CONSULTANT SELECTION

 The Engineering Department has completed the review of the SOQ's of which 14 were submitted.  Based on the results of the evaluations, 6 firms were chosen for the drainage projects effective February 1, 2020 through January 31, 2022.  This selection does not guarantee that projects will be available for all firms during the effective dates.

The firms were ranked in the following order:

  • Kimley-Horn
  • Lockwood, Andrews & Newnam, Inc.
  • HDR
  • Gresham Smith
  • Nathan D Maier Consulting Engineers
  • Jones | Carter  

  

     TRANSPORTATION ENGINEERING DESIGN AND ON-CALL SERVICES

The Engineering Department has completed the review of the SOQ's of which 14 were submitted. Based on the results of the evaluations, 5 firms were chosen for the transportation engineering design and on-call services effective December 14, 2018 through July 31, 2021.  This selection does not guarantee that projects will be available for all firms during the effective dates.

The firms were ranked in the following order:

  • Binkley & Barfield - C&P, Inc.
  • Kimley-Horn and Associates, Inc. 
  • Lee Engineering, LLC
  • Bridgefarmer & Associates
  • Walter P. Moore

 

RESIDENTIAL STREET PROJECTS CONSULTANT SELECTION

The Engineering Department has completed the review of the SOQ's of which 29were submitted.  Based on the results of the evaluations, 8 firms were chosen for the residential street projects effective July 25, 2018 through June 30, 2020.  This selection does not guarantee that projects will be available for all firms during the effective dates.

The firms were ranked in the following order:

  • Binkley & Barfield
  • Garver
  • Walter P. Moore
  • Birkhoff, Hendricks & Carter, L.L.P.
  • Burgess & Niple
  • Teague Nall & Perkins
  • Lockwood, Andrews & Newman, Inc.
  • Pacheco Koch

            

WATER AND WASTEWATER FACILITY PROJECTS    

The Engineering Department has completed the review of the SOQ’s of which 8 were submitted for the elevated storage tank projects and 6 for the wasterwater facility projects.  Based on the results of the evaluations, Birkhoff, Hendricks & Carter was chosen for the elevated storage tank projects as well as for the wastewater lift station projects effective August 27, 2014 through June 30, 2016.

The firm selected: 

  • Birkhoff, Hendricks & Carter, LLP

 

 


   

 

 

 

 

 

 

 

mangakakalot