Show/Hide

For the latest updates on the novel coronavirus (COVID-19) and resources, visit cityofcarrollton.com/coronavirus.

Streets, Drainage and Traffic Division

Print
Press Enter to show all options, press Tab go to next option

These divisions of Public Works are responsible for the infrastructure in Carrollton.

Streets: 

  • Maintenance and repair of streets, alleys, curbs and sidewalks
  • Weekly "Street Closures" Listings
  • Street sweeping of major thoroughfares
  • Pavement crack and joint sealing
  • Pressure grouting of sunken pavements
  • Brush and litter control within street right-of-way
  • Street sanding during winter weather
  • Railroad grade crossing improvements

Drainage:

  • Drainage channel maintenance
  • Control of drainage from underground springs in public right-of-way
  • Maintenance of storm sewers
  • Removal of obstructions from drainage culverts
  • Repair and replacement of guardrails
  • Bridge maintenance
  • Screening walls (along streets); repair / repainting

Traffic Operations

  • Installation and maintenance of traffic control signs
  • Installation and maintenance of traffic signals and school zone flashers
  • Installation and maintenance of pavement markings
  • Perform vehicle and pedestrian traffic counts